Brennan industrial park
12-unit speculative industrial park with shared yard and phased handover programme.
31,000 sq m
14 months
2026

Why us
12-unit speculative industrial park with shared yard infrastructure
- 12 speculative industrial units across 31,000 sq m in Rotterdam.
- Brownfield site remediation completed to agreed validation criteria.
- Steel portal frame units ranging from 1,800 to 4,200 sq m.
- Roof-mounted photovoltaic panels installed on all 12 units.
- EV charging provision across all car parking areas.
- First four units handed over four months ahead of programme.
details

Speculative industrial development requires a contractor who can deliver a high-quality product to programme, within a fixed cost envelope, and with a clear understanding of the end occupier's requirements.
The enabling works programme included ground remediation across the brownfield site, installation of new site-wide drainage and utility infrastructure, and construction of the shared access roads and yard areas. The remediation strategy was developed in close coordination with the environmental consultant and the local planning authority.
- Brownfield site remediation to agreed validation criteria
- New site-wide drainage, utilities, and access infrastructure
- Shared yard and HGV circulation areas to full load specification
Unit construction and envelope
Each of the 12 units was constructed using a steel portal frame with insulated composite cladding, roof-mounted photovoltaic panels, and EV charging provision. Units range from 1,800 to 4,200 sq m to attract a broad occupier mix. Four units were pre-let before practical completion.
- Steel portal frame units ranging from 1,800 to 4,200 sq m
- Roof-mounted photovoltaic panels on all 12 units
- EV charging provision across all car parking areas
Phased handover
The scheme was delivered in three phases, with the first four units handed over four months ahead of the overall practical completion date. This early occupation programme was agreed with the client at pre-construction stage and built into the master programme from day one.
"A well-run, professionally delivered scheme. The phased handover approach added real value to our letting strategy."

Halstead Industrial
Corven Capital Real Estate
Axium Data Centres
Vectara Logistics
Nordfeld Group
Keep scrolling
1
Delivered on time, every time
Every project runs on a detailed baseline programme with milestone tracking and proactive early warning to protect your completion date.
2
Open-book cost management
Monthly cost reports reconcile against the agreed contract sum so clients always have full visibility of where their budget stands.
3
180+ machines ready to hire
Our maintained fleet covers excavators, loaders, compactors, and specialist plant — available for short or long-term hire across Europe.
4
ISO 45001-aligned safety systems
Robust health and safety management is embedded into every project, with site-specific plans, daily briefings, and full incident reporting.
5
BREEAM and LEED delivery
We target recognised sustainability certifications as standard, managing carbon, waste, and energy performance across the full supply chain.
6
30 years of large-scale delivery
Over three decades of commercial, industrial, and infrastructure construction across 18 countries and €4.2B in delivered contract value.
focus on










precision