Nordvik logistics hub

Large cross-dock logistics facility with civil works, steel frame, and MEP systems.

85,000 sq m
22 months
2026
Nordvik logistics hub
Why us

85,000 sq m cross-dock logistics facility with full civil and structural package

  • 85,000 sq m cross-dock distribution facility.
  • 22-month construction programme completed on schedule.
  • Long-span portal steel frame across three construction zones.
  • 92 dock leveller positions with automated door systems.
  • Full ESFR sprinkler system and LED high-bay lighting throughout.
  • Handed over in two phases to enable early client occupation.
details
Nordvik logistics hub

The Nordvik logistics hub required the delivery of one of the largest single-phase industrial construction programmes undertaken in the region, within a 22-month construction period.

The project commenced with extensive enabling works including site clearance, ground improvement, and infrastructure diversions across the full 18-hectare site. A detailed geotechnical programme informed the design of the piled slab foundation system, which was engineered to support heavy forklift loads and racking systems across the full floor plate.

  • Site-wide ground improvement and geotechnical monitoring programme
  • Piled slab foundation system across 85,000 sq m floor plate
  • Full site infrastructure including access roads, drainage, and utilities

Structural frame and envelope

The superstructure consists of a long-span portal steel frame erected in phased packages to maintain programme momentum across the full footprint. Insulated composite cladding panels, rooflights, and high-speed loading doors were installed in parallel with the structural programme to accelerate the weather-tight programme milestone.

  • Long-span portal steel frame across three construction zones
  • 92 dock leveller positions with automated door systems
  • Insulated composite cladding with full weather performance specification

MEP, fit-out, and handover

The mechanical and electrical installation included LED high-bay lighting across all warehouse zones, full ESFR sprinkler system, underfloor heating in the office and welfare block, and a site-wide BMS. The project was handed over in two phases to allow the client to commence fit-out operations ahead of full building completion.

"The site team delivered a programme of exceptional complexity with a level of professionalism and coordination that exceeded our expectations at every stage."
Mesh background

Services included

We provide comprehensive home construction, renovation, and maintenance solutions.

Fleet available now

Equipment rental

Short and long-term rental of excavators, loaders, dumpers, compactors, and specialist plant for construction engineering projects.

plus icon
Projects
320+
Experience
25+ years
Impact
180 machines
Equipment rental
Built at scale

Large-scale construction

Full-cycle delivery of large civil infrastructure projects including roads, bridges, earthworks, and utility networks.

plus icon
Projects
140+
Experience
30+ years
Impact
2.1M sq m
Large-scale construction
Built to perform

Commercial construction

Full-cycle construction of office buildings, business centers, logistics hubs, and large commercial developments.

plus icon
Projects
95+
Experience
28+ years
Impact
€1.8B
Commercial construction
Keep scrolling
1

Delivered on time, every time

Every project runs on a detailed baseline programme with milestone tracking and proactive early warning to protect your completion date.

2

Open-book cost management

Monthly cost reports reconcile against the agreed contract sum so clients always have full visibility of where their budget stands.

3

180+ machines ready to hire

Our maintained fleet covers excavators, loaders, compactors, and specialist plant — available for short or long-term hire across Europe.

4

ISO 45001-aligned safety systems

Robust health and safety management is embedded into every project, with site-specific plans, daily briefings, and full incident reporting.

5

BREEAM and LEED delivery

We target recognised sustainability certifications as standard, managing carbon, waste, and energy performance across the full supply chain.

6

30 years of large-scale delivery

Over three decades of commercial, industrial, and infrastructure construction across 18 countries and €4.2B in delivered contract value.

Nordvik logistics hub
Tell us about your project
Contact
Button icon dark

focus on

Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo

precision

We deliver construction, renovation, and maintenance solutions across a range of projects.

Get in touch
Button icon dark
Mesh background