Meridian business center

8-storey grade-A office with curtain wall facade, full MEP, and CAT A fit-out.

48,000 sq ft
18 months
2026
Meridian business center
Why us

8-floor office development with full MEP and facade package

  • 8-storey grade-A office building in Warsaw, Poland.
  • 18-month construction programme on a live urban site.
  • Reinforced concrete frame using climbing formwork system.
  • Unitised curtain wall facade with triple-glazed solar control units.
  • Full HVAC system with floor-by-floor zone control and BMS integration.
  • CAT A fit-out delivered across all 8 floors and two basement levels.
details
Meridian business center

The Meridian business center required the delivery of a fully operational grade-A office building within a tight 18-month construction programme in a live urban environment.

The project began with enabling works and deep piled foundation installation, followed by the reinforced concrete frame which was completed floor by floor using a climbing formwork system. The structural programme was managed to allow early facade and MEP installation on lower floors while upper floors were still under frame construction.

  • Piled foundation system designed to 12m depth across the full footprint
  • Reinforced concrete frame using climbing formwork for programme efficiency
  • Early facade installation sequence to protect weather-sensitive MEP works

Facade and building envelope

The building envelope consists of a full-height unitised curtain wall system, specified for thermal performance, acoustic attenuation, and long-term weather resistance. The facade package was coordinated closely with the structural engineer to manage deflection tolerances and ensure the system performed to the required air and water tightness standards.

  • Unitised curtain wall system across all elevations
  • Triple-glazed units with solar control coating
  • Integrated automated solar shading on south and west elevations

MEP systems and fit-out

The mechanical and electrical installation covered full HVAC distribution, BMS integration, electrical distribution boards on each floor, fire detection and suppression systems, and structured data cabling throughout. CAT A fit-out across all office floors was completed and handed over ready for tenant fit-out works to commence.

  • Full HVAC system with floor-by-floor zone control
  • BMS integration covering heating, cooling, lighting, and access control
  • CAT A fit-out delivered across 8 office floors and two basement levels
"A complex project delivered on programme and within budget. The level of coordination and on-site management was exceptional throughout the build."
Mesh background

Services included

We provide comprehensive home construction, renovation, and maintenance solutions.

Built to perform

Commercial construction

Full-cycle construction of office buildings, business centers, logistics hubs, and large commercial developments.

plus icon
Projects
95+
Experience
28+ years
Impact
€1.8B
Commercial construction
Minimal downtime

Commercial refurbishment

Cat A and Cat B fit-out and full refurbishment of offices, headquarters, retail environments, and mixed-use developments.

plus icon
Projects
80+
Experience
20+ years
Impact
€620M
Commercial refurbishment
Fleet available now

Equipment rental

Short and long-term rental of excavators, loaders, dumpers, compactors, and specialist plant for construction engineering projects.

plus icon
Projects
320+
Experience
25+ years
Impact
180 machines
Equipment rental
Keep scrolling
1

Delivered on time, every time

Every project runs on a detailed baseline programme with milestone tracking and proactive early warning to protect your completion date.

2

Open-book cost management

Monthly cost reports reconcile against the agreed contract sum so clients always have full visibility of where their budget stands.

3

180+ machines ready to hire

Our maintained fleet covers excavators, loaders, compactors, and specialist plant — available for short or long-term hire across Europe.

4

ISO 45001-aligned safety systems

Robust health and safety management is embedded into every project, with site-specific plans, daily briefings, and full incident reporting.

5

BREEAM and LEED delivery

We target recognised sustainability certifications as standard, managing carbon, waste, and energy performance across the full supply chain.

6

30 years of large-scale delivery

Over three decades of commercial, industrial, and infrastructure construction across 18 countries and €4.2B in delivered contract value.

Meridian business center
Tell us about your project
Contact
Button icon dark

focus on

Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo
Project photo

precision

We deliver construction, renovation, and maintenance solutions across a range of projects.

Get in touch
Button icon dark
Mesh background