Meridian business center
8-storey grade-A office with curtain wall facade, full MEP, and CAT A fit-out.
48,000 sq ft
18 months
2026

Why us
8-floor office development with full MEP and facade package
- 8-storey grade-A office building in Warsaw, Poland.
- 18-month construction programme on a live urban site.
- Reinforced concrete frame using climbing formwork system.
- Unitised curtain wall facade with triple-glazed solar control units.
- Full HVAC system with floor-by-floor zone control and BMS integration.
- CAT A fit-out delivered across all 8 floors and two basement levels.
details

The Meridian business center required the delivery of a fully operational grade-A office building within a tight 18-month construction programme in a live urban environment.
The project began with enabling works and deep piled foundation installation, followed by the reinforced concrete frame which was completed floor by floor using a climbing formwork system. The structural programme was managed to allow early facade and MEP installation on lower floors while upper floors were still under frame construction.
- Piled foundation system designed to 12m depth across the full footprint
- Reinforced concrete frame using climbing formwork for programme efficiency
- Early facade installation sequence to protect weather-sensitive MEP works
Facade and building envelope
The building envelope consists of a full-height unitised curtain wall system, specified for thermal performance, acoustic attenuation, and long-term weather resistance. The facade package was coordinated closely with the structural engineer to manage deflection tolerances and ensure the system performed to the required air and water tightness standards.
- Unitised curtain wall system across all elevations
- Triple-glazed units with solar control coating
- Integrated automated solar shading on south and west elevations
MEP systems and fit-out
The mechanical and electrical installation covered full HVAC distribution, BMS integration, electrical distribution boards on each floor, fire detection and suppression systems, and structured data cabling throughout. CAT A fit-out across all office floors was completed and handed over ready for tenant fit-out works to commence.
- Full HVAC system with floor-by-floor zone control
- BMS integration covering heating, cooling, lighting, and access control
- CAT A fit-out delivered across 8 office floors and two basement levels
"A complex project delivered on programme and within budget. The level of coordination and on-site management was exceptional throughout the build."

Halstead Industrial
Corven Capital Real Estate
Axium Data Centres
Vectara Logistics
Nordfeld Group
Keep scrolling
1
Delivered on time, every time
Every project runs on a detailed baseline programme with milestone tracking and proactive early warning to protect your completion date.
2
Open-book cost management
Monthly cost reports reconcile against the agreed contract sum so clients always have full visibility of where their budget stands.
3
180+ machines ready to hire
Our maintained fleet covers excavators, loaders, compactors, and specialist plant — available for short or long-term hire across Europe.
4
ISO 45001-aligned safety systems
Robust health and safety management is embedded into every project, with site-specific plans, daily briefings, and full incident reporting.
5
BREEAM and LEED delivery
We target recognised sustainability certifications as standard, managing carbon, waste, and energy performance across the full supply chain.
6
30 years of large-scale delivery
Over three decades of commercial, industrial, and infrastructure construction across 18 countries and €4.2B in delivered contract value.
focus on










precision










